|
|
|
|
• PLATFORM OF THE NEW MADRID – ZARAGOZA – BARCELONA – FRENCH FRONTIER HIGH SPEED RAILWAY LINE. STRETCH: PONTOS – FIGUERAS
Gerona, 2005
Detailed design
|
|
|
|
|
• INTEGRACIÓN DEL FERROCARRIL EN BALMASEDA
Vizcaya, 2008-2010
Estudio Informativo
|
|
|
|
|
• VALLADOLID – BURGOS NORTH-NORTHWEST HIGH SPEED RAILWAY LINE. STRETCH: CABEZON DE PISUERGA – SAN MARTIN DE VALVENI
Valladolid, 2008
Detailed design
|
|
|
|
|
• ARTXANDA TUNNEL, STATION AND URBAN DEVELOPMENT IN MATIKO
Vizcaya, 2007
Detailed design
|
|
|
|
|
• BURY OF THE METRO IN URDULIZ. (URBAN RAILWAY OF BILBAO (FMB))
Bilbao, 2006
General Approach
|
|
|
|
|
• EJE TRANSVERSAL FERROVIARIO. TRAMO IGUALADA-MANRESA-CASTELLBISBAL
Barcelona, 2006-2007
Estudio Informativo
|
|
|
|
|
• NEW EAST COAST HIGH SPEED RAIL ACCESS. Stretch: Picanya – Valencia
Valencia, 2003-2006
Detailed design. Control and supervision of works
+ INFO
|
|
|
|
|
• TRANWAY OF BARCELONA, TRAMBESOS. STRETCH: LAS GLORIES SQUARE – SANT ADRIA DEL BESOS
Barcelona, 2005-2006
Detailed design
+ INFO
|
|
|
|